149/25 Lot 1: Construction And Electrical Works On The Connection Of Transformers Vučionica For The Needs Of Se In The Epcg Žnk Circuit According To The "Turnkey" System And Lot 2: Construction And Electrical Works On The Connection Of Combined Transformers For The Needs Of Se In The Epcg Žnk Circuit According To The "Turnkey" System