Nature Of The Work: The Work Consists In Particular Of: Construction Of A Viaduct In Mixed Construction Of 11 Spans With A Total Length Of 386M, Piers With A Maximum Height Of 17.5M, Foundations By Piles Diam. 1.2M. Creation Of A Noise Barrier On The Structure With A Height Of 3.6M. Backfilling/Clearing Work (100,000M3) Of Networks And Sanitation. Treatment Of Excavated Material For Reuse. Construction Of A Retention Basin And Expansion Of An Existing Basin. Road Works And Construction Of A Cycle Path. Work Execution Time: 660 Working Days Expected Start Of Work: October 2026