Assembling,Linking By Hsfg Bolting,Providing H-Beam Sleeper And Launching Of Steel Girder On Abutment Of Bridge No. 100 (1X76.20M)By Using Calender-Hamilton Span As A Launching Nose To Facilitate The End Launching Over Shah Canal At Km22/758.9 In Between Patial-Hazipur In Mex-Talwarasection I/C With Nangaldam-Talwara New Bg Lineand Taking Over Siding Mukerian-Talwara In Jurisdiction Of Bridge Line Jat